HRS - Ask. Learn. Share Knowledge. Logo

In Engineering / College | 2025-07-07

A properly prepared connecting area should be:
a. Slightly larger than the wire
b. On the bottom and centered on the pipe
c. Moist and dull
d. On the top and centered on the pipe

Asked by jose2cold

Answer (1)

The best option for a properly prepared connecting area is to have it 'on the bottom and centered on the pipe' for optimal stability and contact. Other choices like 'moist and dull' or presentation issues can result in ineffective connections. Ensuring the correct location and condition enhances the performance of the connection. ;

Answered by GinnyAnswer | 2025-07-07